Skip to product information
1 of 2

Keystone Lintels

Keystone Lintel CFS/K-110 WIL WBS

Keystone Lintel CFS/K-110 WIL WBS

Regular price £309.14 GBP
Regular price Sale price £309.14 GBP
Sale Sold out
Duties included. Shipping calculated at checkout.
Quantity

This heavy duty cavity lintel from Keystone Lintels Ltd is designed for structural support above openings in cavity wall construction. Manufactured from galvanised steel, it measures 1350mm in length, 325mm in width, and 234mm in height, making it suitable for a range of general building applications where durability and strength are required.

Typically fitted by bricklayers or general builders, this lintel is intended for use in walls featuring an inner leaf of 125-150mm and an outer leaf of 102mm. Its compatibility with cavity widths from 110mm to 125mm supports a variety of masonry builds, allowing for flexibility on site during installation.

Trade accounts with 30-day credit available — your prices, fast reordering.
30-day returns · UK delivery available at checkout.
Secure checkoutAmerican Express Apple Pay Diners ClubDiscoverGoogle Pay KlarnaMaestroMastercard PayPalShop Pay Union PayVisa
View full details

Specifications

BrandKeystone Lintels
Manufacturer part no.KCFS11WIL135WBS
cavity width compatibility110-125mm
composite action requiredNo
height thickness or depth234mm
inner leaf supportNo
integrated dpcNo
lintel materialPre-Galvanised Steel
lintel typeCavity
materialGalvanised Steel
outer leaf supportNo
thermal break includedNo
width325mm
GTIN / Barcode5023545021779